3 Assessments Quality Lithonia GA Septic System Installers Perform Before Designing

Posted on: November 10, 2017 by in Septic System Installers
No Comments

Lithonia GA Septic System Installers, septic tank install Lithonia GA, septic tank installation Lithonia GA, septic system install Lithonia GA, septic system installation Lithonia GA

Quality Lithonia GA septic system installers do a lot of legwork, long before a unit gets placed into the ground. A new unit will last years, and possibly even generations, if it’s set up the right way, but it can malfunction immediately if it’s not. Additionally, all Lithonia GA septic system installers must acquire a permit in order to carry out the install, and may will have to partner with city or county officials to show that certain tests were performed in order to continue. These three evaluations are essential first steps that should always be taken before any job or designs are done, and it may also be advantageous to do them before you purchase a property, so you can be assured that a tank and leach field will be allowed.

1. Pit

The pit test is quite uncomplicated. During this test, a hole is dug down and the soil is analyzed to figure out its structure. A typical leach field is dependent on the soil’s composition to drain successfully. If there is a considerable amount of gravel or sand, your leach field should be ready to discharge the effluent (water) from the tank well, where the soil will finish cleaning it. If the soil has a lot of clay or rock, it won’t drain well, consequently a standard leach field will not be an alternative. If the location you’ve selected does not pass the pit test, you may be able to pick another site on your home or use an alternate type of drain field, such as a mound system.

2. Perc

The perc, or percolation test, requires excavating a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then saturating it with water. The hole is commonly left saturated for about two hours, and topped off as needed. After this, the hole is filled with 6 inches of water and monitored for water drainage.

3. Visual

There are a variety of things an inspector will check visually. A lot of units are gravity-fed, so they don’t rely upon electricity or pumps to shift effluent from the tank to the leach field. As a result of this, the slope of the ground is very important. An inspector will also try to find inclines that could possibly feed excessive water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.

Choose Quality Lithonia GA Septic System Installers Today

Selecting the right design, style of system, and assessing the land properly, are all integral steps in making sure an install goes off without a hitch. Most importantly, these steps guarantee that the install is done correctly, so that a system provides many years of use without problems. If you’re preparing for an install, contact Septic Tank Pros Covington GA. Our partner technicians are skilled and dedicated to quality, so you could be sure the job is done right. Call (678) 212-5257 today.

Comments are closed.

hello
Submit your review
1
2
3
4
5
Submit
     
Cancel

Create your own review

Average rating:  
 1 reviews
 by Alison Manning on Septic Tank Pros Covington GA
Highly recommended!

Highly recommended! Two thumbs up!

MEDIA







Septic Tank Repair





Septic System Service





Septic Repair





Septic Installation Cost